ATB700 Fully Threaded
Bar & 'AT' Rockbolts
Double Twisted
Hexagonal PVC
Coated Mesh
Composite Self Drilling
Soil Nails
FT500 Fully Threaded
Composite Bar & Tube
Self Drilling Steel
Anchor System
Turmag Drilling Machine
Welded Mesh
Fibre Mesh
 

  CIVILS
  
  Conisbrough Tunnel
  PorthKerry Tunnels
  The Bradway Tunnel
  Athens Metro
  Glenholt Tunnel
  Conway Castle
  The Sidmouth Cliffs
  A5 - North Wales
  Brokenberry Quarry
  Tondu Iron Works
  Chatham Dock
  A638 Rocknetting
  Blaston Hollow
  Whitehaven Harbour
  Coalfields Link
  Lancaster Canal
  Kingsand Sea Defence
  Doveholes
  
  MINING
  
  

Weldgrip Gripforce ® Rockbolts, Drilling Machines, Drill Steels and PVC Coated Steel Mesh

 
A638 Wakefield Road Rocknetting at Dewsbury, West Yorkshire
Kirklees Metropolitan Council
Total Access [UK] Ltd
Weldgrip Gripforce ® Rockbolts, Weldgrip Drilling Machines
Weldgrip Drill Steels, Weldgrip PVC Coated Steel Mesh
 

The Dewsbury rock netting project was a Kirklees Metropolitan Council scheme to protect the safety of pedestrians and motorists from the possibility of rock fall on to the A638, Wakefield Road, near Dewsbury town center.

The area protected was a rock cutting of approximately 10 metres vertical height, above an existing 3 metre high retaining wall. The rock slope above the retaining wall was secured by Weldgrip PVC coated mesh and Gripforce ® Rockbolts. Two areas were netted, one approximately 100 metres and a 50 metre length, joining into an existing area which had been netted previously.


Loose vegetation was removed from the slope, with care taken not to disturb any plant and tree root systems. Galvanised and PVC coated welded steel mesh with an aperture size of 75 x 75mm was used to secure the rock slope. The rolls of mesh were laid from the top of the slope, overlapping adjacent sections by 225mm. These were joined together by stainless steel clips, using a compressed air clipping gun.


Weldgrip Turmag compressed air drilling machines and hollow turbine scroll drill steels, with twin wing bits, were used to drill the 32mm diameter rockbolt holes. An air flush method of drilling was employed.


<< A Turmag Drilling Machine drilling holes for the rockbolts

Weldgrip 25mm diameter Gripforce ® Rockbolts were used to secure the netting. The 2.5m long bolts were placed at 3 metre centres along the top and bottom of the slope.

Shorter 1.5m long bolts were used as required, to secure the mesh between the two rows.

Mesh cut to fit around the existing trees >>


The rockbolts were installed into two 800mm long polyester resin slow set capsules. To ensure the resin was mixed correctly, the rockbolts were spun through the capsules to the back of the hole.

<< Mesh joints being secured by stainless steel clips


A stainless steel rope was secured along the top and bottom rows to tension the mesh. All the work carried out on the slope was by rope access.

Production bolts being tested >>

On site pull test were done to test the bond strength between the rock/resin interface. Tests were made on bolts installed at the top of the slope to 40kN of load.

<< Mesh laid from the top to the bottom of the cutting.


A scaffold was erected from the footpath to 1 metre above the top of the existing wall, as a temporary safety fence whilst work was carried out.

Gripforce ® Rockbolts used to secure the mesh >>

The PVC coated mesh was secured by tightening the nuts onto 150mm diameter end plate assemblies.


Download the Printable PDF Brochure

If you would like to print the brochure for more information on our drilling products please click on the download button.

You will need Adobe Acrobat Reader to view and print the brochure, if you need to download a free version of Acrobat Reader please click here.

3.5 meg


Download the Printable PDF Brochure

If you would like to print the brochure for more information on our soil nails and rockbolts please click on the download button.

You will need Adobe Acrobat Reader to view and print the brochure, if you need to download a free version of Acrobat Reader please click here.

4.2 meg

© 2006 Weldgrip Geotechnical , All Rights Reserved