Home About Contact News
Minova Weldgrip
Weldgrip R32N Self-Drilling Anchors and Drill Bits
Weldgrip Products

- Machinery

- Universal Grout System
- AM1000-1 Thixotropic Grout
- Grout Pump Systems
- Turmag Drilling Machine
- Gopher Drilling Machine

- Reinforcement

- Self Drilling Steel Anchor System
- Composite Self Drilling Soil Nails
- Gripforce® Composite Soil Nails & Rockbolts
- FT500 Fully Threaded Composite Bar & Tube
- ATB700 Fully Threaded Bar & AT Rockbolts

- Ancillaries


- Drill Bits
- Drill Steels

- Mesh Products

- Double Twisted Hexagonal PVC Coated Mesh
- Gabions & Mattresses

Weldgrip Case Studies
- Dawlish Cliff Stabilisation
- Ramsden Bellhouse & Kent Hill
- Flood Risk Management
- Boness Embankment Stabalisation
- A259 Road Stabilization
- Doveholes Stabilisation
- Kingsand Sea Defence
- Lancaster Canal
- Coalfields Link
- Whitehaven Harbour
- Blaston Hollow
- A638 Rocknetting
- Chatham Dock
- Tondu Iron Works
- Brokenberry Quarry
- A5 - North Wales
- The Sidmouth Cliffs
- Conway Castle
- Glenholt Tunnel
- Athens Metro
- The Bradway Tunnel
- PorthKerry Tunnels
- Conisbrough Tunnel
- Face Salvage
- Mesh Cage System



 




 

 

 

Embankment Stabalisation

Case Study Project Info
Project Title The Bo'ness Supermarket Embankment Stabilisation Project
Client Re-Bau Construction Ltd
Main Contractor Lidl Supermarkets
Sub Contractor Vertical Access Ltd
Featured Products Weldgrip R32N Self-Drilling Anchors and Drill Bits

Thumbnail - Click for  Enlargment
Thumbnail - Click for  Enlargment
Thumbnail - Click for  Enlargment
Thumbnail - Click for  Enlargment
Thumbnail - Click for  Enlargment
Thumbnail - Click for  Enlargment

The project involved the stabilisation of a 1000 m² embankment above a new build supermarket complex in Bo'ness, Scotland.

Installation of 170 self-drilling anchors of up to 12m in length together with retaining mesh and geo-matting was required to produce a stable embankment and promote vegetation growth. All the anchors drilled utilised the Weldgrip R32N self-drilling anchor system, together with a variety of sacrificial drill bits to suit the varying types of strata (heavily faulted basalt and sandstones).

The anchors were installed using a purpose designed drilling platform built by Vertical Access Ltd. and mounted on standard & specialised telehandeling equipment.

The system of work allowed for high production rates and easy drilling operations giving significant time savings on project scheduling. A mixture of grout flush & air flush drilling operations were used depending upon local ground makeup.

Comments from Vertical Access Geotechnical Project Manager Shaun Ainley:

“The use of the Self Drilling Anchor system in combination with our purpose built drilling platform allowed for rapid production & location repositioning. This allowed the meshing stage of the project to proceed ahead of schedule".

 

Download the Printable PDF Brochure

If you would like to print this case study you can download the full printable brochure in PDF format.

You will need Adobe Acrobat Reader to view and print the brochure, if you need to download a free version of Acrobat Reader please click here.

Download the Case Study in PDF Format