Home Page ButtonAbout Us ButtonContact Us ButtonLinks Button
Weldgrip Geotechnical LogoGound Stabalisation solutions for the civil engineering and mining industries - Strapline
Weldgrip Gripforce ® 22mm Soilnails
Weldgrip Products

- Machinery

- Universal Grout System
- AM1000-1 Thixotropic Grout
- Grout Pump Systems
- Turmag Drilling Machine
- Gopher Drilling Machine

- Reinforcement

- Self Drilling Steel Anchor System
- Composite Self Drilling Soil Nails
- Gripforce® Composite Soil Nails & Rockbolts
- FT500 Fully Threaded Composite Bar & Tube
- ATB700 Fully Threaded Bar & AT Rockbolts

- Ancillaries


- Drill Bits
- Drill Steels

- Mesh Products

- Double Twisted Hexagonal PVC Coated Mesh
- Gabions & Mattresses

Weldgrip Case Studies
- Dawlish Cliff Stabilisation
- Ramsden Bellhouse & Kent Hill
- Flood Risk Management
- Boness Embankment Stabalisation
- A259 Road Stabilization
- Doveholes Stabilisation
- Kingsand Sea Defence
- Lancaster Canal
- Coalfields Link
- Whitehaven Harbour
- Blaston Hollow
- A638 Rocknetting
- Chatham Dock
- Tondu Iron Works
- Brokenberry Quarry
- A5 - North Wales
- The Sidmouth Cliffs
- Conway Castle
- Glenholt Tunnel
- Athens Metro
- The Bradway Tunnel
- PorthKerry Tunnels
- Conisbrough Tunnel
- Face Salvage
- Mesh Cage System






Coalfields Link Phases 2 and 3 - Weldgrip Gripforce ® 22mm Soilnails

Case Study Project Info
Project Title Coalfields Link Phases 2 and 3
Client Coalfields Link Phases 2 and 3
Main Contractor VHE Ltd
Sub Contractor Keller Ground Engineering
Featured Products Weldgrip Gripforce ® 22mm Soilnails

Thumbnail - Click for  Enlargment
Thumbnail - Click for  Enlargment
Thumbnail - Click for  Enlargment
Thumbnail - Click for  Enlargment
Thumbnail - Click for  Enlargment
Thumbnail - Click for  Enlargment
Thumbnail - Click for  Enlargment

The Coalfields Link Road project is part of the coalfields regeneration scheme to the north-east of Barnsley.

The project involved construction of a new road and stabilisation of a steep embankment running parallel to the road to carry a footbridge. Stabilisation of the embankment was achieved by using Weldgrip 22mm diameter Gripforce ® Soilnails in lengths of four and five metres.

The embankment was then covered with a plastic mesh, the mesh being retained by means of non-metallic end plates fixed to the composite soil nails and nuts. The BBA approved system offers a 120 year working life, providing both reinforcement of the embankment and control of the surface of the excavation.

“Use of the Weldgrip Gripforce ® bar gave us several advantages over using a steel reinforcement system –

1: It was light and easy to handle.
2: The bar was delivered to site complete with spacers and hence ready to use – we needed no assembly crew or area.
3: Use of the Gripforce ® bar meant that no additional corrosion protection was required.
4: All of the above meant that installation was simpler and faster.”

 

Download the Printable PDF Brochure

If you would like to print this case study you can download the full printable brochure in PDF format.

You will need Adobe Acrobat Reader to view and print the brochure, if you need to download a free version of Acrobat Reader please click here.

Download the Case Study in PDF Format
Product Brochure - Soil Nails & Rockbolts - 620k
Divider

BBA Certificate
Weldgrip are also proud to have attained BBA accreditation and ISO 9001 standards in recognition of our continuing excellence in Geotechnical products and services.
ISO 9001

© 2008 Weldgrip Geotechnical , All Rights Reserved