The Coalfields Link Road project is part of the coalfields
regeneration scheme to the north-east of Barnsley.
The project involved construction of a new road and stabilisation
of a steep embankment running parallel to the road to carry
a footbridge.
|
Stabilisation of the embankment
was achieved by using Weldgrip 22mm diameter Gripforce ®
Soilnails in lengths of four and five metres.
The embankment was then covered with a plastic mesh, the mesh
being retained by means of non-metallic end plates fixed to
the composite soil nails and nuts.
|
|
 |
The BBA approved system offers a 120 year working life, providing
both reinforcement of the embankment and control of the surface
of the excavation.
<< Light weight Gripforce ®
bar makes transportation around site fast and convenient.
|

Two 5m lengths of bar handled with ease. |

Geotextile mesh fitted over
the bar. |
|
 |
<< Mesh secured
by non-metallic end plates.
Comments from the Keller site engineer:
“Use of the Weldgrip Gripforce ®
bar gave us several advantages over using a steel reinforcement
system –
1: It was light and easy to handle.
2: The bar was delivered to site complete
with spacers and hence ready to use – we needed no assembly
crew
or area.
|
 |
3: Use of the Gripforce
® bar meant that no additional corrosion protection
was required.
4: All of the above meant that installation
was simpler and faster.”
<< The finished seeded embankment. |
Download the Printable PDF Brochure
If you would like to print the brochure for more information
on our soil nails and rockbolts please click on the download
button.
You will need Adobe Acrobat Reader to view and print the brochure,
if you need to download a free version of Acrobat Reader please
click
here.
 |
4.2 meg |
|
|
|