ATB700 Fully Threaded
Bar & 'AT' Rockbolts
Double Twisted
Hexagonal PVC
Coated Mesh
Composite Self Drilling
Soil Nails
FT500 Fully Threaded
Composite Bar & Tube
Self Drilling Steel
Anchor System
Turmag Drilling Machine
Welded Mesh
Fibre Mesh
 

  CIVILS
  
  Conisbrough Tunnel
  PorthKerry Tunnels
  The Bradway Tunnel
  Athens Metro
  Glenholt Tunnel
  Conway Castle
  The Sidmouth Cliffs
  A5 - North Wales
  Brokenberry Quarry
  Tondu Iron Works
  Chatham Dock
  A638 Rocknetting
  Blaston Hollow
  Whitehaven Harbour
  Coalfields Link
  Lancaster Canal
  Kingsand Sea Defence
  Doveholes
  
  MINING
  
  

Coalfields Link Phases 2 and 3
Weldgrip Gripforce ® 22mm Soilnails

 
Coalfields Link Phases 2 and 3
Barnsley Metropolitan Borough Council
VHE Ltd
Keller Ground Engineering
Weldgrip Gripforce ® 22mm Soilnails
 



The Coalfields Link Road project is part of the coalfields regeneration scheme to the north-east of Barnsley.

The project involved construction of a new road and stabilisation of a steep embankment running parallel to the road to carry a footbridge.


Stabilisation of the embankment was achieved by using Weldgrip 22mm diameter Gripforce ® Soilnails in lengths of four and five metres.

The embankment was then covered with a plastic mesh, the mesh being retained by means of non-metallic end plates fixed to the composite soil nails and nuts.

The BBA approved system offers a 120 year working life, providing both reinforcement of the embankment and control of the surface of the excavation.

<< Light weight Gripforce ® bar makes transportation around site fast and convenient.



Two 5m lengths of bar handled with ease.

Geotextile mesh fitted over the bar.

<< Mesh secured by non-metallic end plates.


Comments from the Keller site engineer:


“Use of the Weldgrip Gripforce ® bar gave us several advantages over using a steel reinforcement system –

1: It was light and easy to handle.

2: The bar was delivered to site complete with spacers and hence ready to use – we needed no assembly crew
or area.


3: Use of the Gripforce ® bar meant that no additional corrosion protection was required.

4: All of the above meant that installation was simpler and faster.”


<< The finished seeded embankment.



Download the Printable PDF Brochure

If you would like to print the brochure for more information on our soil nails and rockbolts please click on the download button.

You will need Adobe Acrobat Reader to view and print the brochure, if you need to download a free version of Acrobat Reader please click here.

4.2 meg

© 2006 Weldgrip Geotechnical , All Rights Reserved