Weldgrip Geotechnical Home Page ButtonContact Us ButtonContact Us ButtonLinks ButtonClick Here to visit the Weldgrip Groundwork site for Meshform products
Weldgrip Geotechnical LogoGound Stabalisation solutions for the civil engineering and mining industries - Strapline
Weldgrip Gripforce ® Rockbolts
Weldgrip Products

- Machinery

- Universal Grout System
- AM1000-1 Thixotropic Grout
- Grout Pump Systems
- Turmag Drilling Machine
- Gopher Drilling Machine

- Reinforcement

- Self Drilling Steel Anchor System
- Composite Self Drilling Soil Nails
- Gripforce® Composite Soil Nails & Rockbolts
- FT500 Fully Threaded Composite Bar & Tube
- ATB700 Fully Threaded Bar & AT Rockbolts

- Ancillaries


- Drill Bits
- Drill Steels

- Mesh Products

- Double Twisted Hexagonal PVC Coated Mesh
- Gabions & Mattresses

Weldgrip Case Studies
- Dawlish Cliff Stabilisation
- Ramsden Bellhouse & Kent Hill
- Flood Risk Management
- Boness Embankment Stabalisation
- A259 Road Stabilization
- Doveholes Stabilisation
- Kingsand Sea Defence
- Lancaster Canal
- Coalfields Link
- Whitehaven Harbour
- Blaston Hollow
- A638 Rocknetting
- Chatham Dock
- Tondu Iron Works
- Brokenberry Quarry
- A5 - North Wales
- The Sidmouth Cliffs
- Conway Castle
- Glenholt Tunnel
- Athens Metro
- The Bradway Tunnel
- PorthKerry Tunnels
- Conisbrough Tunnel
- Face Salvage
- Mesh Cage System



 




 

 

 

Tunnel Refurbishment - Gripforce ® Rockbolts

Case Study Project Info
Project Title Conisbrough Tunnel Refurbishment
Client Railtrack
Main Contractor Amalgamated Construction Co. Ltd
Featured Products Weldgrip Gripforce ® Rockbolts

Thumbnail - Click for  Enlargment
Thumbnail - Click for  Enlargment
Thumbnail - Click for  Enlargment
Thumbnail - Click for  Enlargment
Thumbnail - Click for  Enlargment
 
The refurbishment of Conisbrough tunnel is part of Railtrack’s ongoing programme of improving the rail network. The tunnel is 235 metres long on the main line between Doncaster and Sheffield. The 6.1m wide tunnel was causing speed restrictions on the line due to inadequate clearances and repairs were required in two areas.

The repairs involved taking out the existing brick lined steel arch reinforcement from previous repairs carried out in the late 1800’s.

Can Geotechnical
An additional 10 Gripforce ®, 31/15 rockbolts 10 metre's long, were used at 3 metre's above rail height inclined into the roof, to reinforce a fractured section of the existing brickwork. These were installed using the internal bore of the Gripforce ® Rockbolt as a breather tube.

The Gripforce ® Rockbolt and a plastic grout tube was installed into each inclined hole and expanding foam used to form a seal. Cementitious grout was pumped through the grout tube filling the hole from the sealed entrance to the top of the hole, until grout started to flow from the Gripforce ® tube. The orifice of the tube was then plugged with a stainless steel peg.

The advantages of using Gripforce ® fibreglass rockbolts in Conisbrough tunnel were:

  • Ease of installing 12 metre lengths by being able to bend the bolts in the confined space of the 6.1m Wide tunnel.
  • Tube delivers the cementitious grout to the back of the hole and displaces build up of water.
  • Ease of transportation into the tunnel.
  • High tensile strength.
  • High corrosion resistant particularly important in the wet conditions.
  • Improved tube/grout interface bond strength.
 

Download the Printable PDF Brochure

If you would like to print this case study you can download the full printable brochure in PDF format.

You will need Adobe Acrobat Reader to view and print the brochure, if you need to download a free version of Acrobat Reader please click here.

Download the Case Study in PDF Format
Product Brochure - Soil Nails & Rockbolts - 620k
Divider

BBA Certificate
Weldgrip are also proud to have attained BBA accreditation and ISO 9001 standards in recognition of our continuing excellence in Geotechnichal products and services.
ISO 9001

Contents Copyright © 2010 Minova Weldgrip Ltd, All Rights Reserved