ATB700 Fully Threaded
Bar & 'AT' Rockbolts
Double Twisted
Hexagonal PVC
Coated Mesh
Composite Self Drilling
Soil Nails
FT500 Fully Threaded
Composite Bar & Tube
Self Drilling Steel
Anchor System
Turmag Drilling Machine
Welded Mesh
Fibre Mesh
 

  CIVILS
  
  Conisbrough Tunnel
  PorthKerry Tunnels
  The Bradway Tunnel
  Athens Metro
  Glenholt Tunnel
  Conway Castle
  The Sidmouth Cliffs
  A5 - North Wales
  Brokenberry Quarry
  Tondu Iron Works
  Chatham Dock
  A638 Rocknetting
  Blaston Hollow
  Whitehaven Harbour
  Coalfields Link
  Lancaster Canal
  Kingsand Sea Defence
  Doveholes
  
  MINING
  
  

Tunnel Refurbishment - Gripforce ® Rockbolts

 
Conisbrough Tunnel Refurbishment
Railtrack
Amalgamated Construction Co. Ltd
Weldgrip Gripforce ® Rockbolts
 

Click on the BBA accreditation logo to download our BBA Certificate in Acrobat PDF format. If you do not have Adobe Acrobat Reader you can download it free here.


The refurbishment of Conisbrough tunnel is part of Railtrack’s ongoing programme of improving the rail network. The tunnel is 235 metres long on the main line between Doncaster and Sheffield. The 6.1m wide tunnel was causing speed restrictions on the line due to inadequate clearances and repairs were required in two areas. The repairs involved taking out the existing brick lined steel arch reinforcement from previous repairs carried out in the late 1800’s.


Before this work could be carried out the areas to be repaired had to be reinforced. A system of stainless steel rockbolts was used for this, however, the strata behind the brick lining was very wet and the lower 12m long rockbolt holes, which dipped at 5 degrees to the horizontal, penetrated the water table. This made grouting the steel bolts very difficult.


To improve the strata reinforcement in the sides of the tunnel, Weldgrip Gripforce ® fibreglass rockbolts were used. The Gripforce ® Rockbolts were 31/15 OD/ID tubes with a tensile strength of 480kN. The tubes, 12 metres long, were installed in 60mm diameter holes 1 metre above track height and dipped at 5 degrees to the horizontal.

Four stainless steel centralisers were used to hold the rockbolts central to the hole, these were positioned equidistant along each bolt. A 200 kN rated high load nut assembly secured each end plate.

A Gripforce ® tube was installed immediately into each hole after drilling and grouted with Sulphate resistant cementitious grout. This was to eliminate any build up of water and sludge and prevent degradation of the holes.

The grout was pumped through the centre of the tube filling the hole from the bottom. It was noted during grouting operations, that water was displaced from the bottom of the hole before grout flowed out.

A total of 100 Weldgrip Gripforce ® Rockbolts were installed at 1 metre above rail height 50 on either side of the tunnel.


Pull out tests on the Gripforce ® Rockbolts gave significantly better results than the equivalent stainless steel bolts.

An additional 10 Gripforce ®, 31/15 rockbolts 10 metre's long, were used at 3 metre's above rail height inclined into the roof, to reinforce a fractured section of the existing brickwork. These were installed using the internal bore of the Gripforce ® Rockbolt as a breather tube.

The Gripforce ® Rockbolt and a plastic grout tube was installed into each inclined hole and expanding foam used to form a seal. Cementitious grout was pumped through the grout tube filling the hole from the sealed entrance to the top of the hole, until grout started to flow from the Gripforce ® tube.
The orifice of the tube was then plugged with a stainless steel peg.

The advantages of using Gripforce ® fibreglass rockbolts in Conisbrough tunnel were:

Ease of installing 12 metre lengths by being able to bend the bolts in the confined space of the 6.1m Wide tunnel.

Tube delivers the cementitious grout to the back of the hole and displaces build up of water.

Ease of transportation into the tunnel.

High tensile strength.

High corrosion resistant particularly important in the wet conditions.

Improved tube/grout interface bond strength.


Download the Printable PDF Brochure

If you would like to print the brochure for more information on our soil nails and rockbolts please click on the download button.

You will need Adobe Acrobat Reader to view and print the brochure, if you need to download a free version of Acrobat Reader please click here.

4.2 meg

© 2006 Weldgrip Geotechnical , All Rights Reserved