ATB700 Fully Threaded
Bar & 'AT' Rockbolts
Double Twisted
Hexagonal PVC
Coated Mesh
Composite Self Drilling
Soil Nails
FT500 Fully Threaded
Composite Bar & Tube
Self Drilling Steel
Anchor System
Turmag Drilling Machine
Welded Mesh
Fibre Mesh
 

  CIVILS
  
  Conisbrough Tunnel
  PorthKerry Tunnels
  The Bradway Tunnel
  Athens Metro
  Glenholt Tunnel
  Conway Castle
  The Sidmouth Cliffs
  A5 - North Wales
  Brokenberry Quarry
  Tondu Iron Works
  Chatham Dock
  A638 Rocknetting
  Blaston Hollow
  Whitehaven Harbour
  Coalfields Link
  Lancaster Canal
  Kingsand Sea Defence
  Doveholes
  
  MINING
  
  

Rail Cutting Stabilisation - Weldgrip R32N Self Drilling Anchors

 
Doveholes Rail Cutting Stabilisation Project
Network Rail
Edmund Nuttall Ltd
Vertical Access Ltd
Weldgrip R32N Self Drilling Anchors
 

Click on the BBA accreditation logo to download our BBA Certificate in Acrobat PDF format. If you do not have Adobe Acrobat Reader you can download it free here.

The Doveholes Rail Cutting Stabilisation Project.

The FA26 Rock Cuttings project involves the stabilisation of several rail cuttings throughout the North West of England.

The Doveholes project involved meshing and doweling a selective area of the cutting face to eliminate rock fall risk to the rail infrastructure.


Mesh securing top anchors were achieved using Weldgrip R32N self drilling anchors.

The anchors were installed using a TEI mast and grout flush system to achieve the 6-8 meter drilling depth.

A variety of Drill Bits were tested & the R32/51mm/ESS-F button bits proved the most productive in the Carboniferous Limestone. Due to embankment instability heavy machines were not permitted on the embankment crest.

Drilling operations were achieved using excavator machines operated from the carriageway.

<< The drilling arm in action



Drilling from the carriageway using
excavator machines

Completed anchor and mesh installation



A typical anchor detail

Meshing work completed

<< Vertical Access operative using anchor for work positioning

Comments of the Vertical Access Contracts Manager:

“The use of the Self Drilling Anchor system allowed us to produce timely work in known problematic ground conditions and prevent program delays on this critical stage of the project.”

“The production of the top anchorages are critical to our operation on this type of project as they are used for both Industrial Roped Access Anchors by operatives and always form the primary stage to our meshing works.”

Click here to view the Vertical Access web site.



Download the Printable PDF Brochure

If you would like to print the brochure for more information on our soil nails and rockbolts please click on the download button.

You will need Adobe Acrobat Reader to view and print the brochure, if you need to download a free version of Acrobat Reader please click here.

4.2 meg

© 2006 Weldgrip Geotechnical , All Rights Reserved