Weldgrip Geotechnical LogoGound Stabalisation solutions for the civil engineering and mining industries - Strapline
Epoxy, galvanised and plain R32 & R38 Self Drilling Anchors, bespoke Head Plates, Rock Netting, Gabions and Geotextiles.
Weldgrip Products

- Machinery

- Universal Grout System
- AM1000-1 Thixotropic Grout
- Grout Pump Systems
- Turmag Drilling Machine
- Gopher Drilling Machine

- Reinforcement

- Self Drilling Steel Anchor System
- Composite Self Drilling Soil Nails
- Gripforce® Composite Soil Nails & Rockbolts
- FT500 Fully Threaded Composite Bar & Tube
- ATB700 Fully Threaded Bar & AT Rockbolts

- Ancillaries


- Drill Bits
- Drill Steels

- Mesh Products

- Double Twisted Hexagonal PVC Coated Mesh
- Gabions & Mattresses

Weldgrip Case Studies
- Dawlish Cliff Stabilisation
- Ramsden Bellhouse & Kent Hill
- Flood Risk Management
- Boness Embankment Stabalisation
- A259 Road Stabilization
- Doveholes Stabilisation
- Kingsand Sea Defence
- Lancaster Canal
- Coalfields Link
- Whitehaven Harbour
- Blaston Hollow
- A638 Rocknetting
- Chatham Dock
- Tondu Iron Works
- Brokenberry Quarry
- A5 - North Wales
- The Sidmouth Cliffs
- Conway Castle
- Glenholt Tunnel
- Athens Metro
- The Bradway Tunnel
- PorthKerry Tunnels
- Conisbrough Tunnel
- Face Salvage
- Mesh Cage System






Epoxy, galvanised and plain R32 & R38 Self Drilling Anchors, bespoke Head Plates, Rock Netting, Gabions and Geotextiles.

Case Study Project Info
Project Title Ramsden Bellhouse & Kent Hill
Client Network Rail East Anglia Territory
Consultant URS
Main Contractor WA Developments/Kier Rail
Featured Products Epoxy, galvanised and plain R32 & R38 Self Drilling Anchors, bespoke Head Plates, Rock Netting, Gabions and Geotextiles.

Thumbnail - Click for  Enlargment
Thumbnail - Click for  Enlargment
Thumbnail - Click for  Enlargment
Thumbnail - Click for  Enlargment
Thumbnail - Click for  Enlargment
 
The Ramsden Bellhouse & Kent Hill project is located near Billericay in Essex. The purpose of the works was to strengthen the embankments using soil nailing techniques.
Can Geotechnical
Approximately 325m of the Up embankment were considered to have a factor of safety against slope failure of less than 1 : 1.15.

Both the Up and Down lines required higher than average maintenance, to correct line and level discrepencies. The combination of gabions, soil nailing and mesh with geotextile increased the factors of safety and improved the serviceability of the two sections of line. The tops of the embankments were strengthened using PVC coated heavy duty gabions infilled with limestone, retained using R38 self drilling soil nails, galvanised and fusion bonded epoxy coated for the last 3m length.

The remainder of the slopes were stabilised with a combination of R38 & R32 soil nails of length between 12m & 19m in length. A C350 geotextile was used to prevent surface erosion and was overlaid with double twist PVC coated mesh joined by stainless steel clips. The bespoke load plates were designed and manufactured to grip the mesh and accommodate the slope of 30 degrees.

 

Download the Printable PDF Brochure

If you would like to print this case study you can download the full printable brochure in PDF format.

You will need Adobe Acrobat Reader to view and print the brochure, if you need to download a free version of Acrobat Reader please click here.

Download the Case Study in PDF Format
Divider

Download a copy of our Link-Up Certification in PDF format

If you would like to print the certificate for more information on our soil nails and rockbolts please click on the download button.

29k

© 2008 Weldgrip Geotechnical , All Rights Reserved